Fulfillment of all Mechanical System and Automation works for Niğde State Hospital with 300 beds on a construction area of 42,000 m2 built by YDA İnşaat and Ayık İnşaat Joint–Venture under a contract awarded by TOKI in addition to the fulfillment of the same hospital’s kitchen and laundry equipment and installation, natural gas system, pneumatic cylinder carrier systems, medical gas system, and garden irrigation system works.
- LocationNİĞDE
- Relevant EntityTOKİ
- Project ScopeMECHANICAL
- Date2010-2011
- Client CompanyYDA İNŞ. SAN. VE TİC. LTD.ŞTİ.&AYIK İNŞ. İTH. İHR. TİC. VE TURZ. LTD. ŞTİ. ENERAY YAPI MAD. ENERJİ TİC. LTD. ŞTİ.




